Northern Arizona University Student Housing Life Safety Upgrades, Flagstaff, Arizona

Sector: Student Housing

Northern Arizona University Student Housing Life Safety UpgradesFisher Engineering (FEI) partnered with RSP Architects to provide fire protection engineering and design services for Northern Arizona University’s student housing facilities. The project involved the retrofit design and installation of fire alarm and sprinkler systems in 26 buildings in five residence halls:

  • South Village Apartments, 16 buildings, 124,548 SF
  • Campus Heights Apartments, 7 buildings, 53,526 SF
  • Gillenwater Hall, one building, 88,302 SF
  • Raymond Hall, one building, 82,070 SF
  • Roseberry Apartments, one building, 31,166 SF

Design and construction spanned two phases. FEI’s services included fire sprinkler system design, fire alarm system design, shop drawing reviews, construction progress surveys, punch-list inspections, and acceptance testing.

So as not to disrupt campus operations, all construction-related work took place during the university’s summer breaks in 2014 and 2015.

Owner

Northern Arizona University

Client

RSP Architects

Location

Flagstaff, AZ

Services Provided

  • Fire sprinkler system design
  • Fire alarm system design
  • Construction progress surveys
  • Pre-inspection/testing
  • Acceptance testing

CONSTRUCTION COST

$12 million

Size

379,612 SF

Completion Date

2015

SRP Project Administration Building, Tempe, Arizona

SRP Project Administration BuildingSalt River Project, a public power utility serving central Arizona, is renovating and expanding its Project Administration Building (PAB), a three-story building housing approximately 1,100 employees. To accommodate an additional 300 employees and to modernize the space, the building is undergoing a complete interior renovation—including all of its building systems—along with an 84,337-square-foot, five-story infill addition.

When completed, the PAB will encompass approximately 431,000 square feet of general office space, along with a domestic water pump area, a main distribution frame area, mechanical and electrical space, telecom rooms, restroom facilities, a front lobby, vertical and horizontal circulation space, a café/eatery, men’s and women’s locker rooms, break rooms, janitors’ closets, O&M closets, storage, mothers’ rooms, and future (flex) space.

As part of the project team, Fisher Engineering, Inc. (FEI) is responsible for fire/life safety code compliance and the design of fire protection systems, including sprinklers, standpipe, and fire pump. FEI is undertaking these efforts concurrently with the five-phased renovation of the building. Construction improvements will bring the building into compliance with the 2012 International Building Code® and its incorporated sub-categories. The project is targeting LEED Gold certification.

The project will be implemented in five phases, with construction spanning a three-year period.

Owner

Salt River Project (SRP)

Client

Corgan Associates

Location

Tempe, AZ

Services Provided

  • Code Consulting
  • Fire Protection Design
  • Life Safety Drawings
  • Construction Administration

Size

431,000 SF

Completion Date

July 2018 (est.)

Project Management Office Black Warrior-Tombigbee/Alabama-Coosa Operations Division, Tuscaloosa, Alabama

Project Management Office Black WarriorThe U.S. Army Corps of Engineers, Mobile District, is constructed a new project management office for the Black Warrior-Tombigbee/Alabama-Coosa Operations Division.  Located in Tuscaloosa, AL, along the banks of the Black Warrior River, the two-story, 20,000-square-foot facility’s occupants are responsible for all civil works activities along the Black Warrior-Tombigbee Waterway, including the Locust Fork, Mulberry Branch, and Alabama-Coosa Waterways. They are charged with operating and maintaining nine locks and dams as well as two hydroelectric generating plants on the Black Warrior-Tombigbee.

HCS Group, PC provided engineering services for the project and asked Fisher Engineering, Inc. (FEI) to provide performance-based fire protection system design services and life safety analysis as part of the design team.

Sustainable and energy-efficient design allowed the project to attain LEED Silver Certification. Furthermore, the project design received the Alabama Council AIA Honorable Mention Award 2014.

Owner

U.S. Army Corps of Engineers, Mobile District

Client

HCS Group PC

Location

Tuscaloosa, AL

Services Provided

  • Development of design analysis
  • Development of construction documents consisting of specification and drawing set
  • Fire hydrant flow testing
  • Design review

CONSTRUCTION COST

$10 million

Size

20,000 SF

Completion Date

2016

Maricopa County ITR and Detention Center, Phoenix, Arizona

Maricopa County ITR and Detention Center

Arrington Watkins Architects was selected by Maricopa County to provide design services for the design and construction of a new, 170,000-square foot intake-transfer-release (ITR) building and a 247,000-square foot housing facility for 1,280 inmates. The buildings are separate but connected by a corridor. The project is intended to replace aging facilities on the county’s Durango Campus.

Arrington Watkins chose Fisher Engineering, Inc. (FEI) to provide code consulting, fire protection engineering, and life safety design services for the project as part of the design team.  As part of our services, FEI worked with the design team to optimize the smoke barrier location so as to minimize mechanical smoke exhaust systems. FEI also performed a detailed egress analysis to ensure proper paths of egress were provided for all occupants, whether restrained or not.

Owner

Maricopa County

Client

Arrington Watkins Architects

Location

Phoenix, AZ

Services Provided

  • Development of code narrative
  • Development of basis of design (FS/FA) narrative
  • Life safety drawings
  • Fire alarm drawings and specification
  • Fire sprinkler drawings and specification

CONSTRUCTION COST

$125 million (est.)

Size

417,000 SF

Completion Date

2017

Churchill County Detention Center, Fallon, Nevada

Churchill County Detention CenterFisher Engineering, Inc. (FEI) was asked by Arrington Watkins Architects to provide code consulting, fire protection and fire alarm design, and construction administration services for a new, $17 million detention center in Fallon, Nevada.

The Churchill County Law Enforcement and Detention Center will replace a 43-year-old jail constructed in 1973, which has an official bed capacity of just 53, which limits the county’s ability to segregate inmates. The new, 39,000-square foot facility has six different housing pods and more than doubles the number of available beds to 120.

This state-of-the-art facility includes medical cells, a booking and intake area, laundry services, and visitation spaces. It will also house a 911/dispatch center, administrative space, and a public entry and reception desk. Inmates’ movement in the facility is restricted; therefore, the building’s occupancy is classified as an I-3, Condition 5 based on the 2012 International Building Code® (IBC). This occupancy type requires an automatic fire sprinkler system, a fire alarm and smoke detection system, and an engineered smoke control system for each smoke compartment that is considered windowless as defined by the IBC.

Owner

Churchill County, NV

Client

Arrington Watkins Architects

Location

Fallon, NV

Services Provided

  • Construction documents development, including specification and drawing set of fire sprinkler and fire alarm systems, as well as facility life safety features
  • Fire protection submittal review
  • In-progress installation review
  • Witnessing final commissioning
  • Design coordination for smoke control system

CONSTRUCTION COST

$17 million

Size

39,000 SF

Completion Date

2017

Yokohama Tire Manufacturing Plant, West Point, Mississippi

Sector: Industrial

Yokohama Tire Manufacturing PlantIn a high-profile project for both Yokohama Tire and the state of Mississippi, Yokohama Tire constructed a new, $300 million manufacturing facility in West Point, Mississippi that can produce up to one million commercial truck tires annually.

KBD Group provided architecture and engineering services for the project and asked Fisher Engineering, Inc. (FEI) to perform fire protection engineering and life safety design, as well as construction period services as part of the design team.

The project encompassed a three-story tire manufacturing facility with accessory office areas, a raw materials warehouse separated from the manufacturing facility with fire walls, a finished product warehouse separated from the manufacturing facility with fire walls, a maintenance building, an office building, a canteen building, and a hazardous materials storage building. Constructed on more than 500 acres of land, the facility currently houses more than 260 employees but will eventually accommodate 500.

Fire protection systems include fire pump, water storage tank sizing, wet pipe sprinkler, and pre-action sprinkler systems.

Owner

Yokohama Tire

Client

KBD Group

Location

West Point, MS

Services Provided

  • On-site fire hydrant flow testing
  • Construction documents development, including specification and drawing set
  • Review of fire alarm design drawings and specification for conformance with applicable codes and standards
  • Shop submittal review
  • Site observations
  • Final fire protection system review

CONSTRUCTION COST

$300 million

Size

1,000,000 SF

Completion Date

2015

Toyo Tire North America Manufacturing Facility, White, Georgia

Sector: Industrial

Toyo Tire North America
Manufacturing FacilityIn response to increasing demand for its light truck and car tires, Toyo Tires North America is expanding its existing manufacturing facility in White, Georgia. The expansion will add approximately 533,000 square feet of manufacturing space and approximately 325,000 square feet of warehouse and storage space, as well as incidental office and administration areas.

KBD Group, Inc. is providing architecture and engineering services for the project and has engaged Fisher Engineering, Inc. (FEI) to provide fire protection engineering and life safety design, as well as construction period services, as part of the design team. Fire protection systems include a fire pump, wet pipe sprinkler systems, and dry pipe sprinkler systems.

The project, when completed, will create 450 new jobs and is part of an ongoing, phased expansion plan that extends through 2018.

Owner

Toyo Tire North America

Client

KBD Group, Inc.

Location

White, GA

Services Provided

  • Fire hydrant flow testing
  • Construction documents development, including specification and drawing set
  • Review of client’s design drawings and specification for conformance with applicable codes and standards
  • Shop submittal review
  • In-progress installation review
  • Final site review

CONSTRUCTION COST

$210 million

Size

1,071,000 SF

Completion Date

2016

Toyo Ink Manufacturing Plant, Bryan, Texas

Sector: Industrial

Toyo Ink Manufacturing PlantFounded in 1976 as a pigments distributor for the Toyo Ink Group, Toyo Ink Mfg. America, LLC is a leading manufacturer and distributor of packaging inks, adhesives, organic pigments, specialty chemicals and polymers for  in North America. In 2010, Toyo Ink elected to expand and renovate its existing, 55,000-square-foot, one-story warehouse manufacturing facility. The site includes two production plants, a warehouse, and an administrative office. The warehouse was expanded by approximately 10,838 square feet, while the gravure factory was expanded by approximately 6,000 square feet. The project included a flammable liquids storage area and general office areas. Due to allowable floor areas, the new addition and existing building were separated by a fire wall (in accordance with IBC Section 503.1) and treated as two separate buildings.

As part of the design team led by KBD Group, Inc., Fisher Engineering, Inc. (FEI), provided code consulting services for the project. Specifically, FEI reviewed the proposed project to determine the applicable building and fire code requirements; developed a code summary related to building construction and life safety features; marked up drawings related to building construction and life safety features provided by the client; and reviewed final design drawings for conformance to applicable building and fire code requirements.

Owner

Toyo Ink

Client

KBD Group, Inc.

Location

Bryan, TX

Services Provided

  • Reviewed applicable building and fire codes
  • Developed code summary related to building construction and life safety features
  • Reviewed final design drawings for conformance to applicable building and fire code requirements

CONSTRUCTION COST

$6 million

Size

Approximately 17,000 SF

Completion Date

2015

Marriott Tri-Branded Hotel, Nashville, Tennessee

Sector: Hospitality

Marriott Tri-Branded HotelIn what will be the nation’s first tri-branded Marriott hotel, Atlanta-based developer North Point Hospitality Group, Inc. is constructing a new hotel in downtown Nashville, Tennessee, just steps away from the Music City Center. The hotel’s three brands will include a 204-unit AC Hotels by Marriott, a 126-unit Residence Inn by Marriott, and a 125-unit SpringHill Suites by Marriott.

The entire structure will encompass five levels of parking and thirteen levels of hotel rooms. The ground floor of the property will feature 15,000 square feet of restaurant and retail space. Additionally, the hotel will offer 6,000 square feet of 19th-floor meeting and banquet facilities with floor-to-ceiling windows and break-out areas.

Winford Lindsay Architect is providing architecture and engineering services for this project and requested Fisher Engineering, Inc. (FEI) to provide performance-based fire protection system design and construction administration services as part of the design team.

Fire protection systems include a fire pump, a wet pipe sprinkler system, a dry pipe sprinkler system, and a standpipe system.  Due to the building’s height, pressure-regulating valves were required for sprinkler and standpipe valves.

Owner

North Point Hospitality Group, Inc.

Client

Winford Lindsay Architect

Location

Nashville, TN

Services Provided

  • Construction documents development, including specification and drawings
  • Shop submittal review
  • Site observation visits
  • Witnessing of Functional Performance Testing
  • Final fire protection system review

CONSTRUCTION COST

$120 million

Size

455 rooms, 19 stories

Completion Date

2017

Northern Arizona University International Pavilion, Flagstaff, Arizona

Northern Arizona University International PavilionTo accommodate its growing population of international students, Northern Arizona University decided to construct a 9,500-square foot International Pavilion. The pavilion provides a gathering space for NAU’s popular International House, or “I-House,” a residence hall that allows about 200 American and international students to live together in a dynamic community.

NAU engaged RSP Architects to provide design services for the facility, and RSP in turn engaged Fisher Engineering, Inc. (FEI) to perform fire protection and fire alarm design services as well as code compliance assistance for the project. FEI’s specific services and deliverables included a code study report; a design narrative; drawing reviews; construction documents development, including specification and fire alarm/fire sprinkler drawings; and construction administration services, including shop submittal review.

The 9,500-square foot pavilion includes a 5,250-square foot auditorium for 350 people, 2,000 square feet of “flex” meeting space for 30 people, a community kitchen and catering kitchen, an outdoor activity deck, offices, a “connection area,” storage and study space, and a lobby. The building is LEED platinum-certified.

Owner

Northern Arizona University

Client

RSP Architects

Location

Flagstaff, AZ

Services Provided

  • Code study report
  • Design narrative development
  • Drawing review
  • Fire alarm/fire sprinkler construction documents
  • Construction administration services, including shop submittal review

CONSTRUCTION COST

$4.3 million

Size

9,500 SF

Completion Date

August 2015