Author Archives: wp_fisheradmin

Kayenta Health Center

Sector: Healthcare

Kayenta-Health-CenterThe new, $150 million Kayenta Health Center serves 200 patients a day on the Navajo reservation in Kayenta, Arizona. The facility encompasses a 13-bed inpatient nursing unit, ambulatory surgery, laboratory, pharmacy, radiology, and emergency departments. Outpatient services include primary care, pediatrics, mental health, dental, eye, physical therapy, and community health and wellness.

When FlintCo, LLC, a commercial construction company, was engaged to provide its services for the new Kayenta Medical Center, they engaged Fisher Engineering, Inc. (FEI) to provide fire protection quality control during design and construction. In this role, FEI reviewed design drawings for the automatic sprinkler, life safety, and fire alarm systems for general compliance with the life safety/fire protection provisions of the applicable codes and standards. FEI then reviewed contractor submittals for compliance with the appropriate construction documents, including applicable codes and standards.

Owner

U.S. Department of Health and Human Services

Client

FlintCo, LLC

Location

Kayenta, AZ

Services Provided

  • Design drawing review
  • Contractor submittal review
  • Life safety review

Construction Cost

$150 million

Size

182,000 SF

Completion Date

2014

Dwight D. Eisenhower Army Medical Center

Sector: Healthcare

Dwight-D-Eisenhower-ArmyThe U.S. Army Corps of Engineers, Mobile District, needed to replace the fire alarm systems at seven buildings at the Dwight D. Eisenhower Army Medical Center (EAMC), a 93-bed medical treatment facility located at the U.S. Army installation at Fort Gordon in Augusta, Georgia. Each of the new systems had to be integrated with the new fire alarm and mass notification system in Building 300. The buildings included:

  • Building 296: BSL III laboratory, one-story, 2,280 SF
  • Building 297: medical records, one-story, 5,100 SF
  • Building 298: hyperbaric and wound care, one-story, 1,650 SF
  • Building 299: MRI, one-story, 3,250 SF
  • Building 300: DDEAMC, 13 occupied stories, 622,700 SF
  • Building 301: family medicine, one-story, 26,733 SF
  • Building 302: maintenance shop, one-story, 5,476 SF

J&J Worldwide Services provided design/build services for the project. Based in part of Fisher Engineering’s extensive experience at Fort Gordon—having completed eight projects there, all of which included complete fire alarm system replacements —J&J Worldwide engaged FEI to provide fire protection engineering consulting, fire alarm/mass notification system design, and construction administration services as part of the design/build team.

Owner

U.S. Army Corps of Engineers, Mobile District

Client

J&J Worldwide Services

Location

Fort Gordon, GA

Services Provided

  • Site surveys
  • Development of design submittals
  • Shop drawing review
  • In-progress installation review
  • Witness acceptance testing

Construction Cost

$3,194,340

Size

667,189 SF

Completion Date

2016

Fort Jackson Starship Barracks and Dining Facility

Sector: Government

Starship-Barracks-and-Dining-FacilityFort Jackson is the U.S. Army’s main production center for basic combat training and houses more than 3,500 active duty soldiers and their 12,000 family members. To meet these troops’ expanding functional and technical needs, Fort Jackson’s starship barracks, which were built in the 1970s, needed to be renovated and expanded. The U.S. Army engaged Woolpert to provide architecture and engineering services for the renovation of three 32,000-square foot starship barracks—Buildings 5422, 5482, and 5500—and the construction of a new, two-quad dining facility to serve more than 5,700 troops. The stacked dining facility is the largest single mess hall facility built at a base and was designed using LEED principles. The work also included a new substation to provide power service for these expansions.

Woolpert asked Fisher Engineering, Inc. (FEI) to join the design/build team and to provide fire protection engineering and life safety design, as well as construction period services. Specifically, FEI performed a design analysis of the interior life safety, fire sprinkler, fire alarm and mass notification systems for each building; developed construction documents consisting of a specification and a drawing set of the interior fire sprinkler, fire alarm and mass notification systems; and conducted performance-based design of the interior fire sprinkler systems.

Owner

U.S. Army Corps of Engineers, Norfolk District

Client

Woolpert

Location

Fort Jackson, SC

Services Provided

  • Design analysis
  • Construction document development
  • Performance-based design
  • Shop submittal review
  • In-progress installation reviews
  • Final site review

Construction Cost

$75 million

Size

96,000 SF

Completion Date

2015

Eglin AFB SOF/AVFID Operations and Maintenance Facilities

Sector: Government

Duke-Field-Eglin-Air-Force-BaseThe U.S. Army Corps of Engineers, Mobile District, selected Bullock Tice Associates to provide design services for the SOF (Special Operations Forces) AvFID (Aviation Foreign Internal Defense) operations and maintenance facilities at Duke Field at Eglin Air Force Base in Florida. The project consisted of a new, two-story squad operations facility, a new wash rack maintenance facility, and renovation of four existing maintenance facilities (Buildings 3115, 3117, 3044 and 3086).

Bullock Tice Associates asked Fisher Engineering, Inc. (FEI) to provide fire protection engineering services related to the development of the project’s life safety plans, as well as to design the interior fire sprinkler and fire alarm/mass notification systems.  All fire protection systems—including the fire sprinkler systems, fire alarm systems, and mass notification systems—were required to be designed to penetrate the Secure Compartmented Information Facilities (SCIF). FEI also provided construction period services, including shop submittal reviews, in-progress installation reviews, and a final site review.

Owner

U.S. Army Corps of Engineers, Mobile District

Client

Bullock Tice Associates

Location

Duke Field, Eglin AFB, FL

Services Provided

  • Life safety planning
  • Interior fire sprinkler design
  • Preaction fire sprinkler and releasing system design
  • Fire alarm and mass notification system design
  • Construction administration services

Construction Cost

$34,824,000

Size

115,000 SF

Completion Date

2015 (services)

General Services Administration (GSA) Surveys

Sector: Government

gsaSince 2003, Fisher Engineering, Inc. (FEI) has been engaged in an ongoing Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide fire protection engineering consulting services for the General Services Administration’s Safety & Environmental Management Branch comprehensive and re-inspection surveys in Region 4.  Our scope of services includes an evaluation based on local fire and building codes, the National Fire Protection Association’s standards and guides, and other industry standards.  Each deficiency noted is assigned a Risk Assessment Code that is based on the Mishap Probability and Hazard Severity pertaining to the specific building, occupants, and mission continuity. FEI then develops recommendations aimed at reducing the building’s overall risk to an acceptable level, not simply at correcting all deficiencies.

FEI personnel perform these services at approximately 100 buildings per year throughout the southeastern United States.  The facilities include courthouses, office buildings, detention facilities, warehouses, childcare centers, and historic structures.

Owner

General Services Administration (GSA)

Client

Various

Location

Various locations in the southeastern U.S.

Services Provided

  • Facility life safety surveys
  • Risk issue documentation
  • Maintenance document and procedures review
  • Development of written report and recommendations for risk mitigation

Construction Cost

N/A

Size

10,000-800,000 SF

Completion Date

Ongoing

Peachtree Summit

Sector: Commissioning

Peachtree-SummitPeachtree Summit is a 31-story skyscraper in downtown Atlanta, Georgia. Built in 1975, Peachtree Summit is known for its triangular shape. The building was constructed on a lot bordered by three streets: Atlanta’s Downtown Connector, West Peachtree Street, and Ivan Allen Jr. Boulevard—hence its unusual shape.

Peachtree Summit includes a three-story lobby that was created to accommodate the late 1970s elevation of West Peachtree Street for MARTA construction. To comply with the International Building Code (IBC), the lobby needed a smoke control system. The IBC additionally requires that a qualified, independent third party Specially Inspect smoke control systems to verify that the system as installed complies with code requirements and the approved construction documents.

Fisher Engineering, Inc. (FEI) was engaged to provide these Special Inspection services. In this role, FEI reviewed design documents, witnessed and directed testing of the smoke control system; and provided a Special Inspection report with recommendations.

Owner

General Services Administration

Client

ARC Incorporated

Location

Atlanta, GA

Services Provided

  • Design documents review
  • Witnessing functional performance testing
  • Development of Special Inspection report and recommendations

Construction Cost

N/A

Size

866,907 SF

Completion Date

2015 (est.)

Drew Charter Senior Academy

Sector: Commissioning

Drew-Charter-Senior-AcademyCharles R. Drew Charter School is the city of Atlanta’s first charter school. It opened in 2000 after an urban revitalization project tore down the blighted East Lake Meadows housing project and replaced it with The Villages of East Lake, an innovative, mixed-income community next to the historic East Lake Golf Club. The school aims to serve as a “pipeline” to college for low-income, minority students.

Since its founding, Drew Charter School’s population has grown from 240 students to over 1,200. In 2012, an effort began to create a 200,000-square foot senior academy for grades 9-12, thus fulfilling the school’s mission to become a “cradle to college” institution.

The building’s design included a three-story atrium that needed a smoke control system to comply with the International Building Code (IBC). The IBC requires that a qualified, independent third party Specially Inspect smoke control systems to verify that the system as installed complies with code requirements and the approved construction documents. Fisher Engineering, Inc. (FEI) was engaged to provide these Special Inspection services. In this role, FEI reviewed design documents, equipment cut-sheets, and air balance reports; witnessed and directed testing of the smoke control system; and provided a Special Inspection report with recommendations.

Owner

Charles R. Drew Charter School/C. F. Foundation

Client

Geo-Hydro Engineers, Inc.

Location

Atlanta, GA

Services Provided

  • Design documents review
  • Witnessing functional performance testing
  • Development of Special Inspection report and recommendations

Construction Cost

$55 million

Size

200,000 SF

Completion Date

2014

Fort Bragg UAV Maintenance Hangar/Company Operations Facility

Sector: Aviation

UAV-Maintenance-HangarFort Bragg, a large, 251-square mile United States Army installation, is home to the U.S. Army Airborne Forces and Special Forces, as well as the U.S. Army Forces Command and U.S. Army Reserve Command. In 2011, Fisher Engineering, Inc. (FEI) was engaged by Merrick & Company to provide performance-based fire protection system design services and life safety analysis as part of a design/adapt-build team for a new UAV (unmanned aerial vehicle) maintenance hangar and company operations facility. Merrick & Company provided architecture and engineering services for the new facility.

The one-story, 12,921-square foot COF was intended to be used for administrative areas and storage of tactical gear. The 121,380-square foot, one-story hangar was designed with a clearance head of 28 feet and to house twelve fully assembled and fueled aircraft.

FEI’s specific services included design analysis and construction documents development. FEI designed a high-expansion foam system, an automatic sprinkler system, a fire alarm and mass notification system, a foam releasing system, and a fire pump system (including primary and redundant pumps) for the hangar. For the COF, FEI designed a sprinkler system, a fire alarm system, and a mass notification system.

Owner

U.S. Army Corps of Engineers

Client

Merrick & Company

Location

Fort Bragg, NC

Services Provided

  • Foam, automatic sprinkler, fire alarm, mass notification, foam release, and fire pump systems design
  • Design analysis
  • Construction documents development

Construction Cost

N/A (not built)

Size

79,000 SF

Completion Date

N/A (not built)

Phoenix Sky Harbor Airport, Terminal 3

Sector: Aviation

Phoenix-Sky-Harbor-AirportPhoenix Sky Harbor International Airport is a civil-military public airport three miles southeast of downtown Phoenix in Maricopa County, Arizona. It is Arizona’s largest and busiest airport.

In 2014, the City of Phoenix began a three-phase project to renovate the airport’s Terminal 3 over a five-year period. The 880,000-square foot terminal has 17 gates separated into two concourses by a central building outside of the security area. The first phase involves a complete remodel and expansion of the terminal’s north and south security checkpoints.

For this first phase of the project, Fisher Engineering, Inc. (FEI) was engaged by the architect, DWL Architects + Planners, to provide an initial review and analysis of egress associated with a number of design options. The egress analysis addressed all code-related requirements, including travel distance, occupant load, common path of travel, door and stair width, and exit capacity.

Owner

City of Phoenix

Client

DWL Architects + Planners

Location

Phoenix, AZ

Services Provided

  • Code consulting services
  • Egress analysis

Construction Cost

$101 million (est.)

Size

880,000 SF

Completion Date

2014

MCAS Maintenance Hangar and Air Traffic Control Tower

Sector: Aviation

MCAS-Maintenance-HangarMarine Corps Air Station (MCAS) New River is a U.S. Marine Corps helicopter and tilt-rotor base in Jacksonville, North Carolina. The Naval Facilities Command (NAVFAC), Mid-Atlantic District, decided to construct Phase III of the VMMT-204 Maintenance Hangar at MCAS New River, where Marine and Air Force Osprey pilots, Marine crew chiefs, and units are trained in the use and maintenance of the MV-22 Osprey tilt-rotor aircraft. The project also entailed raising the air station’s Airport Traffic Control Tower (ATCT) cab.

Merrick & Company, which provided architectural services as part of a design/build team, engaged Fisher Engineering, Inc. (FEI) to provide performance-based fire protection system design services and life safety analysis for the project. Specifically, FEI developed a design analysis related to the interior life safety, fire sprinkler, fire alarm and mass notification systems for the facility in accordance with NAVFAC standards; developed construction documents consisting of a specification and a drawing set of the interior fire sprinkler, fire pump, fire alarm and mass notification systems; and performed construction period services such as shop submittal review, in-progress installation reviews, and final site review.

Owner

Naval Facilities Command, Mid-Atlantic District

Client

Merrick & Company

Location

Marine Corps Air Station, New River, Jacksonville, NC

Services Provided

  • Design analysis
  • Construction documents development
  • Shop submittal review
  • In-progress installation reviews
  • Final site review

Construction Cost

$25 million

Size

35.000 SF

Completion Date

2014