Crude Oil Loading Facility

Crude-Oil-Loading-FacilityAs part of the rail portion of a new cryogenic gas processing plant that processes 50-75 million cubic feet of gas per day, Plains Gas Solutions constructed a new crude oil loading facility in Ross, North Dakota. The facility has the capacity to trans-load 8,500 barrels per day of natural gas liquids (NGLs) and 20,000 barrels per day of crude oil. In its second phase, the crude oil facility was expanded to provide unit train loading capability of up to 65,000 barrels per day. It is now served by a new, 16-mile, 10-inch crude oil pipeline extending from Plains’ Robinson Lake pipeline near Stanley, North Dakota to the company’s Ross complex.

Wilson & Co. retained Fisher Engineering, Inc. (FEI) to provide fire protection engineering services. Specifically, FEI performed conceptual fire protection design; developed construction documents for the preaction foam-water fire sprinkler system for the facility’s loading platform, the fire pump house, and the preaction foam-water releasing system; and reviewed fire protection design submittals. The system was designed to require little intervention from the operations personnel and/or responding fire departments because the local, all-volunteer fire department had limited manpower.

Owner

Plains Marketing, LP

Client

Wilson & Company, Inc.

Location

Ross, ND

Services Provided

  • Conceptual fire protection design
  • Construction document development
  • Design submittal review

Construction Cost

$80 million

Size

N/A

Completion Date

2013

Colt Crude Oil Loading Terminal

Colt-Crude-Oil-Loading-TerminalRangeland Energy’s Crude Oil Loading Terminal (COLT) is North Dakota’s largest open-access crude oil distribution hub. Located in the Bakken and Three Forks shale oil-producing areas, the COLT terminal provides refiners, marketers, and producers with outbound service by unit train and through the COLT Connector. The connector is a 21-mile, bidirectional pipeline that links the COLT terminal with multiple existing and planned pipelines at Rangeland’s Dry Fork Terminal near Tioga, North Dakota.

With six 120,000-barrel storage tanks and two 8,700-foot rail loops, the COLT hub accommodates large, 120-car unit trains and is capable of moving more than 120,000 barrels of crude oil per day out of the Bakken Shale.  Its initial 720 MBL (thousands of barrels) of working storage capacity is expected to expand as Bakken production increases.

Wilson & Co. retained Fisher Engineering, Inc. (FEI) to provide fire protection engineering services, which included conceptual fire protection design; developed construction documents for the preaction foam-water fire sprinkler system for the facility’s loading platform, the fire pump house, and the preaction foam-water releasing system; and reviewed fire protection design submittals. The system was designed to require little intervention from the operations personnel and/or responding fire departments because the local, all-volunteer fire department had limited manpower.

Owner

Rangeland Energy, LLC

Client

Wilson & Company, Inc.

Location

Epping, ND

Services Provided

  • Conceptual fire protection design
  • Construction document development
  • Design submittal review

Construction Cost

$100 million

Size

N/A

Completion Date

2012

Kubota Tractor Manufacturing Facility

Sector: Industrial

Kubota-Manufacturing-FacilityTo add to its existing manufacturing facility on an 88-acre site in Jefferson, Georgia, agricultural machinery manufacturer Kubota Industrial Equipment constructed a new manufacturing facility to produce compact tractor models. The facility encompasses approximately 484,000 square feet of manufacturing space, 2,000 square feet of hazardous materials storage/use space, 6,000 square feet of office space, and 7,000 square feet of cafeteria space. It supports a production capacity of 22,000 units each year.

KBD Group provided architecture and engineering services for the project and asked Fisher Engineering, Inc. (FEI) to perform fire protection engineering design, life safety design, and construction period services as part of the design team. Specifically, FEI provided code analysis and code consulting services, performed explosion venting calculations, developed a code narrative for submission to local building officials, and reviewed the architect-engineer’s drawings for compliance with the code narrative.

Owner

Kubota Industrial Equipment

Client

KBD Group

Location

Jefferson, GA

Services Provided

  • Code analysis
  • Code consulting
  • Explosion venting calculations
  • Development of code narrative for submission to local building officials
  • Review of A/E drawings for compliance with code narrative

Construction Cost

$73 million

Size

522,000 SF

Completion Date

2013

VWR West Coast Distribution Center

Sector: Industrial

VWR-West-Coast-Distribution-CenterWhen VWR International, LLC, a global solutions provider of laboratory supplies, equipment and services, decided to build a new distribution center in Visalia, California, VWR hired Fisher Engineering, Inc. (FEI) to provide third-party oversight of the project’s fire protection and life safety features.

The 500,000-square foot facility is used for storage and distribution of laboratory supplies and chemicals. It encompasses a 30,000-square foot room for flammable and combustible liquids, a 5,000-square foot room for storage of oxidizers, a 30,000-square foot room for storage of health hazards, and a two-story, 20,000-square foot office building. The remainder of the facility serves as general warehouse space. It houses more than 90 employees.

For the project, FEI developed a conceptual fire protection strategy, met with local building and fire officials to present that strategy, and reviewed the architect-engineer’s construction documents for strategy compliance. FEI reviewed submittals for the fire pump, fire sprinkler, foam-water fire sprinkler, firm alarm, and gas detection systems while also performing in-progress installation review and witnessing acceptance testing of all of these systems. FEI also provided training on the building’s design and operations to building inspectors and city fire operations personnel.

Owner

VWR International, LLC

Client

Epstein

Location

Visalia, CA

Services Provided

  • Conceptual strategy development
  • Third-party oversight
  • Construction document review for compliance
  • Submittal review
  • In-progress installation review
  • Witness acceptance testing
  • Training

Construction Cost

$40 million

Size

500,000 SF

Completion Date

2012

Four Points by Sheraton at Toka Sticks

Sector: Hospitality

Four-Points-by-Sheraton-HotelThis new Four Points by Sheraton hotel at Toka Sticks serves as the anchor to a significant development at the historic, 18-hole Toka Sticks Golf Club by the Wild Horse Pass Development Authority. The development includes not only the six-story, 74,000-square foot, 134-room hotel but also a new, 3,800-square foot clubhouse and a state-of-the-art, 5,700-square foot golf cart storage and maintenance building. The project is located adjacent to the Phoenix-Mesa Gateway Airport and near Arizona State University’s Polytechnic campus.

RSP Architects was selected to provide design and construction services for the project. Fisher Engineering, Inc. (FEI) was selected to provide code consulting services and third-party review services.  Our third-party review services verified that the project’s fire and life safety systems were designed and installed to Sheraton’s standards.

Owner

Gila River Indian Community

Client

RSP Architects

Location

Mesa, AZ

Services Provided

  • Code consulting
  • Third-party review

Size

83,500 SF

Completion Date

2014

Marion Square Hotel

Sector: Hospitality

Marion-Square-HotelWhen Charleston, South Carolina’s thriving tourist industry sparked demand for luxury lodging, Library Associates, LLC, responded with plans to build a full-service, 185-room luxury hotel at the former Charleston County library site. The eight-story, 105-foot-tall structure will include an underground parking deck with double-stacked vehicles, a ballroom on the first floor, and a pool, bar, and private event space on the rooftop terrace. On the ground level, four retail spaces will face King Street in Charleston’s historic Marion Square.

Lindsay Pope Brayfield Clifford & Associates, Inc. is providing architecture and engineering services for this project and requested Fisher Engineering, Inc. (FEI) to provide performance-based fire protection system design services as part of the design team. FEI’s specific services include fire hydrant flow testing; construction documents development, including specification and performance-based design; building and life safety code review of construction documents; shop submittal review; in-progress installation reviews; functional performance testing of fire pump system; and final site review.

The project broke ground in April 2015 and is expected to be completed in early 2017.

Owner

Library Associates, LLC

Client

Lindsay Pope Brayfield Clifford

Location

Charleston, SC

Services Provided

  • Fire hydrant flow testing
  • Construction documents development, including specification and performance-based design
  • Building and life safety code review of construction documents
  • Shop submittal review
  • In-progress installation reviews
  • Functional performance testing of fire pump system
  • Final site review

Construction Cost

$101 million (est.)

Size

210,000 SF

Completion Date

2017 (est.)

Aloft Hotel and Parking Garage

Sector: Hospitality

Aloft-Hotel-and-Parking-GarageOne of Starwood Hotels and Resorts’ nine brands, Aloft Hotels are select-services hotels with more than 85 locations worldwide. When Starwood decided to add another Aloft Hotel in Greenville, South Carolina, Winford Lindsay Architects were selected to design the new, seven-story hotel and the five-story, 470-space city parking garage beneath it.  In turn, Winford Lindsay engaged Fisher Engineering, Inc. (FEI) to provide fire protection engineering and life safety design for the project.

Opened in the fall of 2015, this Aloft location includes 144 rooms and an amenity pool deck in its 90,100 square feet of space. The hotel is adjacent to Laurens Street, Greenville’s first dedicated pedestrian street. The hotel’s lobby exits directly onto the street.

 

Owner

Starwood Hotels and Resorts

Client

Winford Lindsay Architects

Location

Greenville, SC

Services Provided

  • Construction documents development, including specification and performance-based design
  • Building and life safety code review of construction documents
  • Shop submittal review
  • In-progress installation reviews
  • Functional performance testing of fire pump system
  • Final site review

Construction Cost

$30 million (est.)

Size

307,000 SF

Completion Date

2016 (est.)

Ardrey Memorial Auditorium at Northern Arizona University

NAU-Memorial-AuditoriumNorthern Arizona University (NAU) is a public university located in Flagstaff, Arizona. As of fall 2014, 27,715 students were enrolled, with 20,134 at the Flagstaff campus.

In 2012, NAU sought to renovate its 1,400-seat Ardrey Memorial Auditorium to improve its ADA accessibility and ensure its fire/life safety code compliance.  Ardrey Memorial Auditorium is a theater and stage that is attached to and a part of the NAU Performing and Fine Arts Center. The original performing arts building to the north was constructed in 1967 and provided approximately 101,000 square feet of space for offices, practice rooms, and two theaters.  Ardrey Auditorium—along with attached classroom and practice spaces totaling 56,000 square feet—was constructed in 1972.

Fisher Engineering, Inc. (FEI) was engaged by RSP Architects to provide fire/life safety/code compliance evaluation, design, and consulting services for the renovation project.

Owner

Northern Arizona State University

Client

RSP Architects

Location

Flagstaff, AZ

Services Provided

  • Site survey and evaluation
  • Code research and report
  • Design consulting and review

Size

157,000 SF

Completion Date

2013

Naval Air Station Guantanamo Bay Hospital

Sector: Healthcare

Naval-Hospital-GTMOEstablished by treaty in 1903, Naval Station Guantanamo Bay is the oldest U.S. military base outside the continental U.S. The Naval Hospital at Naval Station Guantanamo Bay has been in operation since September 1956.

When the U.S. Naval Facilities Engineering Command (NAVFAC), Southeast decided to restore the 120,000-square foot Naval Hospital’s building systems, Fisher Engineering was retained by the design/build architect, Bullock Tice Associates, to perform performance-based fire protection system design services and life safety analysis. Specifically, FEI performed a fire hydrant flow test; designed a new, automatic wet pipe sprinkler system throughout the entire building; provided a new, intelligent, analogue-addressable fire alarm and mass notification system; and performed a building code analysis.

The hospital provides 24-hour care and remained operational during all phases of the work.

Owner

U.S. Naval Facilities Engineering
Command, Southeast

Client

Bullock Tice Associates

Location

Naval Station Guantanamo Bay
Guantanamo Bay, Cuba

Services Provided

  • Development of fire protection and life safety design drawings
  • Specification
  • Hydraulic calculations
  • Contractor shop submittal reviews
  • Witnessing acceptance testing

Construction Cost

$10 million

Size

120,000 SF

Completion Date

2013

Maricopa Integrated Health Services

Sector: Healthcare

Maricopa-Integrated-Health-ServicesMaricopa Integrated Health Services (MIHS), which provides health care services for the citizens of Maricopa County, Arizona, serves nearly 20,000 inpatients and 300,000 outpatients each year.

To ensure building code compliance at its facilities, MIHS contracts with a third party to act as its authority having jurisdiction (AHJ). In this role, the AHJ conducts an annual field inspection of MIHS facilities. MIHS asked Fisher Engineering, Inc. (FEI) to review inspection comments in the AHJ’s report and to offer opinions and recommendations regarding implementation options.

FEI performed code research to confirm the inspection report’s findings and explored alternative code compliance options. Next, FEI conducted a site survey at the referenced locations to further review field conditions and evaluate alternatives. FEI then developed a report documenting recommendations regarding the inspection items.

Owner

Maricopa Integrated Health Services

Client

Maricopa Integrated Health Services

Location

Phoenix, AZ

Services Provided

  • Code research
  • Site survey
  • Report development

Construction Cost

N/A

Completion Date

2014